[Error loading the WebPart 'NavigationHovers' of type 'NavigationHovers']
The specified path, file name, or both are too long. The fully qualified file name must be less than 260 characters, and the directory name must be less than 248 characters.

Phase verification system

PVS100i

 
  • PVS100i
  • Overview  
  • Downloads  
Overview
  • Phase identification at all voltage levels in real time
  • GPS connection and GPS cache (1 h buffer)
  • Measurement on LV, HV and capacitive test points
  • Easy to operate via touch display
  • Eliminates safety hazards
  • Fast and precise phase identification saves time and money

Whether you are restructuring a network, planning new network systems or performing switching operations, precise phase identification is essential for the safe and reliable operation of a network.

The PVS 100i assists you in checking the phase quickly and precisely. It helps you to avoid faulty switching, eliminates safety risks, reduces operation expenses, prevents a one-sided load of the network and improves the service.

Downloads